Project:Motor Press S.A.
Location: Kryoneri
Timeframe: 2002 – 2003
Employer: Motor Press S.A.
A modern office and lab building complex including 3 standalone buildings connected with pathways, also housing two underground garages.
Air conditioning in the building uses two air-cooled chillers by TRANE with a 110RT capacity each and two HOVAL boilers, each with a 500,000Kcal/h capacity. To bear cooling and thermal loads, FCUs by TRANE are installed in the perimeter, while a VAV system bears internal zone loads. There are also standalone air conditioning units of pre-conditioned air and air discharge fans installed in each building. The meeting room has an independent air handling unit installed, that fully serves all when in operation.
An electrical substation with a 800KVA transformer supplies the building with electricity, using medium and low voltage. Each floor is equipped with an independent switchboard.
A telephone and data network runs throughout the building leading to the Computer Room. The building also has a fire detection network, an alarm system, a CCTV network, etc.