Project: ARHONTIKO KALTEZIOTI.
Location: Kapsia, Tripoli
Timeframe: 2013-2014
Employer: ARHONTIKO KALTEZIOTI.

The heating of the hotel is performed by split unit heat pumps DAIKIN ALTERMA FLEX TYPE. There are two outdoor DAIKIN units with a heating capacity of 44,8KW each.

The first outdoor unit is connected to four indoor DAIKIN EKHBRD units with a Boiler DAIKIN 260lit each, and it provides hot water and heating for the hotel.

The second outdoor unit is connected to four indoor DAIKIN EKHBRD units and it provides only heating for the hotel.

The whole heating and hot water supply system is connected to a BMS system with energy meters and the ability to monitor function and the consumption of hot water and heating power in the hotel.

With this solution the two existing boiler of the hotel 400.000Kcal/h and 60.000Kcal/h were abolished.

« »